Mihama Plant Japan’s post-Fukushima nuclear future is again being questioned in the wake of regulatory authorities’ decision to extend the life of three reactors at two nuclear power plants despite another aftershock. A decision by the Nuclear Regulation Authority of Japan to extend the life of three reactors at two nuclear power plants in the Fukui Prefecture has rekindled worry about a possible repeat of the 2011 Fukushima disaster, as it comes only a week after the neighboring Fukushima Prefecture was rocked by a 7.4 aftershock. The decision will see the #3 reactor of Kansai Electric Power Co’s Mihama plant, along with two more, operate for another 20 years, bringing their total lifetime to 60 years. The other two reactors that received a life extension are part of the Takahama power plant. The earthquake that shook Fukushima last Monday caused a stoppage in the cooling system of the Fukushima […]