thyssenkrupp has signed a contract with Illinois-based CF Industries to supply a 20 megawatt alkaline water electrolysis plant to produce green hydrogen at their Donaldsonville, Louisiana, manufacturing complex. The work is expected to begin in the second half of 2021 and finish in 2023. thyssenkrupp 20MW electrolyzer CF Industries will integrate the carbon-free hydrogen generated by the electrolysis plant into existing ammonia synthesis loops to enable the production of 20,000 tons per year of green ammonia. When complete in 2023, the Donaldsonville green ammonia project will be the largest of its kind in North America. As countries around the world work to reach net-zero carbon emissions by 2050, hydrogen has emerged as a leading source of clean energy. Industry experts project hydrogen will meet approximately 20% of the world’s energy needs by 2050, up from less than 1% today. Ammonia is a critical enabler for the storage and transport […]